06 · Post-Quantum Readiness

Quantum‑safe crypto.

A capable quantum computer will break the RSA and elliptic-curve cryptography under every connection, signature and sign-in. We help leadership find where it is used, decide what changes first, and prove the transition to the board, auditors and regulators.

Why now

The risk is already in the data you hold today

011011000110 CAPTURED TODAY Q-DAY

Harvest now, decrypt later

Traffic captured today can be read once a capable quantum computer exists. Long-lived records are already exposed.

! GENUINE FORGED SAME KEY, SAME SEAL

Forge later

Once signing keys can be derived, servers, users, certificates and software updates can be impersonated.

~20M <1M 2019 2025 Qubits to break RSA-2048

Sooner than estimated

Estimates of the machine needed to break RSA-2048 fell from about 20 million qubits in 2019 to under one million in 2025.

RSA ECC TLSVPNPKIPaymentsHSMCode signingSign-in

Every estate

RSA and elliptic curve sit under TLS, VPNs, PKI, payments, HSMs, code signing and sign-in.

The deadline

Deprecated after 2030. Disallowed after 2035.

NIST has set end dates for every approved RSA and elliptic-curve key size, and governments and regulators have dated their own transitions against them. Past cryptographic changes took ten to twenty years. This one has nine.

  • United States: migration leads named in 2026; high-value systems on post-quantum signatures by the end of 2031.
  • United Kingdom: discovery and plan by 2028, priority migrations by 2031, complete by 2035.
  • European Union: first steps by the end of 2026, high-risk use cases by 2030.
  • Australia: classical asymmetric cryptography ends by 2030.
  • G7 financial sector: most critical systems 2030 to 2032, overall target 2035.

What we deliver

Discover. Assess. Govern.

The replacement standards exist. The hard part is finding every place the old algorithms are used and coordinating thousands of owners, suppliers and budgets. We run it as a governed program on one system of record, from the first inventory to the board report.

Authoritative inventoryCryptographic inventories from many sources, aggregated, consolidated and deduplicated into one view.
Risk and policy engineNational and sector regulations, guidelines and standards applied to the inventory as findings.
DISCOVERASSESSGOVERN
Plan, decide, deliverOne system of record for planning, decisions and programs, with evidence of completed actions.
Third-party riskEach supplier’s position collated and tracked, from no position to certified.
Technical assuranceSigned reports for the board, audit, third-party risk, regulators and program leads.

How it works

From the plan to the board report

The plan, owners and supplier positions come before any scan. Decisions and dated actions follow the inventory.

Before any scan As the inventory arrives 1PlanSponsor, scope andrisk horizon on record2OwnersA named owner forevery systemin scope3SuppliersEach supplier’sposition andits evidence4InventoryDiscovered orimported, linkedto systems5DecisionsRemediate, acceptor except, witha reason6ActionsDated programwork, closedwith evidence7ReportA signed snapshotthe board andauditors can check
  1. 1
    PlanSponsor, scope and risk horizon on record
  2. 2
    OwnersA named owner for every system in scope
  3. 3
    SuppliersEach supplier’s position and its evidence
  4. 4
    InventoryDiscovered or imported, linked to systems
  5. 5
    DecisionsRemediate, accept or except, with a reason
  6. 6
    ActionsDated program work, closed with evidence
  7. 7
    ReportA signed snapshot the board and auditors can check
One system of recordEvery step recorded against a named person, with a reason and a date. Reports are signed so the board and auditors can check them.

The first 90 days

Governed, not compressed

Started now, the transition fits inside the refresh and release cycles you already run. Started late, it becomes one rushed project with higher cost and outages. The end dates do not move; the only variable is when you start.

  • Planning workshop: ownership, suppliers and a first plan.
  • Owner and mandate: a named C-level sponsor.
  • Published plan: scope, risk horizon and policy.
  • First inventory: critical systems with long-lived data.
  • Supplier positions: requested from critical suppliers.
  • First board report: a dated baseline and a signed snapshot at day 90.

Start with a plan, not a scan.

Book a planning workshop. Within one quarter the board has a named owner, a published plan and its first signed report.

Start a conversation